Machine shipped, container loaded
After the foreign customer's product order is confirmed, after 30 days of production, installation,
and qualified inspection, the container will be loaded and shipped to the South American
customer.
After the machine debugging and inspection is completed, the next step is delivery.
The delivery mainly includes the following aspects:
1.First disassemble the machine, and disassemble the installed equipment according to the requirements of the cabinet;
2. Then pack the plastic film according to the dismantling of each part;
3. After the container and forklift arrive, load all parts of the machine;
4. After all parts of the machine are loaded into the container, each piece of goods needs to be fixed and bundled;
5. Check to make sure that each part is fixed firmly;
6. Finally, carry out the container sealing operation.
Sole injection molding machine one mold one pair of sole production video
Machine shipped, container loaded
Slippers, sandals trademark production
China Slipper Machine - Cooling Fan Installation
Equipment heating and automatic start
24 station two-color disc sole injection machine
TPU disc injection molding machine
Workshop production site video
How does the monochrome blower machine produce plastic leather shoes?